Last updated Nov 26, 2026, 9:24 a.m. Maple Ridge time (Pacific)

Pitt Meadows weather
Environment Canada
Advertisement

Advertise with us

Local

Military's avalanche-control role at Rogers Pass stays in place for now, with no exit date set

Parks Canada says there is still no date for the Canadian Armed Forces to leave the 65-year-old agreement that protects the Trans-Canada Highway from avalanches in Glacier National Park.

Maple Ridge / Nov 24, 2026
By The Maple Ridge Current newsroom

Parks Canada says no date has been set for the Canadian Armed Forces to end its longstanding agreement to control avalanches at Rogers Pass, after earlier word that the military would stop supporting the program after Aug. 17, 2027, Black Press Media reports.

Parks Canada said in a Nov. 16 email that, following further consideration, the exit date is open. The program began in 1961 and uses military howitzers and personnel to bring down dangerous snow before it can slide. To make that safe, Parks Canada closes a 43-kilometre stretch of the Trans-Canada Highway and the CPKC rail line for hours, and sometimes days, in winter.

National Defence told Black Press Media last spring that the military faces significant resource pressures and plans to retire the legacy artillery systems used in the program. Parks Canada says it is working with the military on a plan to move avalanche control away from reliance on the howitzers. A spokesperson said the reliability of this section of the highway is critical to the Canadian economy.

For drivers and shippers who depend on the route east of the Okanagan and Kootenays, closures for avalanche control remain part of the winter picture.

Local news for Maple Ridge and Pitt Meadows